EXPERIENCE/DESIGN

 |
|
Project: Detailed engineering of the S-PVC 1 and S-PVC 2 plants, ship unloading and reactor loading in petrochemical processing plant.

Client: Petroquímica Colombiana S.A. – PETCO S.A.

Work done:
- a. Basic and detailed engineering, start up of number 3 bedding sphere. Increasing the production capacity for S-PVC 1 by 1000tm/year.
- b. Ammonia based cooling system for line 1 of S-PVC 2 reactors.
- c. Detailed and basic engineering for the optimization of ship unloading and S-PVC 2 reactor loading system for
- d. Installation of new water treatment plant with a capacity of 11,500m3/d and two inverse osmosis units

Project Length: 2003

Man hours: 18.000 MH
|
| |
|
|
|
 |
CSR: Itansuca has been working towards greater Social Responsibility with regards to our corporate practices. See more...
|

|
 |
Value Promise: Our clients are the reason we exist for. We base our service standards on five pillars that create win-win relationships with each client and help them realize their project objectives. See more... |
|